From: Frank Mitchell - Properties Board Chairperson
To the BoG this is a short list. I have requested a list of things that need doing from the teachers.
Asterisk denotes importance health and safety
Small jobs 1-2 hours
Weed around school buildings.
(they have been sprayed dead remnants just need removing)
Paint scuff marks on buildings.
Replace burnt out lights in Church.*
(14 foot ladder work)
Remove/replace water heater in admin. Building.**
Replace Administration front door.
Map out bird nesting areas for sealing this fall.
Big jobs more than 2 hours
Paint front of two story school building, bottom of deck down.
Spread new bark in area behind overflow room.
Remove and replace rotting fascia, along front of admin. Building.
Scrape peeling paint on Admin. Building windows prime and repaint.
Replace loose window putty Admin. Building front windows.
Remove peeling paint from trim on Parish Hall repaint.
Major repairs
The South wall of the overflow room needs attention
1.Remove rotting fascia
2.Replace backed out nails with screws and seal
3.Prime and paint wall panels
4.Replace fascia and paint
5. Install protective metal flashing as per code
6. Replace any damaged panels
Repair/replace and paint facade on front of administration building
Build new backstop.
Upgrade outside lighting with led's more light lower cost.
Replace worn carpet as necessary.
Remove damaged kneelers.*
Repair damage to the ends of pews.*
Repair cracked and raised deck in front of Sanctuary.***
Reseal parking lot.
The parsonage needs a new stove $1400+. And the roof needs attention